Please SUBSCRIBE now to get email notifications each time I add a new blog entry. Thanks to all of the readers for being interested in my adventures!

With the new building in place, it’s time to start loading it up with bikes.

 

Here comes more stuff.

 

Next is the workbench

Then the running DR and rolling chassis DR

With a cozy fit, the bikes have to come out for the stuff to go in.

 

The essential organizing tool is the pegboard.

 

Up up and away goes the clutter

The next hurdle is the shelf won’t fit under the loft so after multiple trips to the hardware store, Jason thinks he has found the solution.  He goes to work on the shelf with a cutoff wheel on his air grinder.  After a few attempts to cut the double walled steel shelf bracket, the grinding wheel comes to a grinding halt.

Out comes my jig saw to save the day!  It took a few blades but I managed to cut through all four posts successfully.

Perry, Fran, and the other Jason come to review the progress.

Now the building is full!

Jason even has a way to work at night.

One last thing for the other building: time to hang up my bicycle for the winter!

Leave a Reply

(required)

(required)

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

© 2012 Adventures of the Antirider Rider Hosting by the other half of the C-team